X
Member Login
User Name:
Password:
Register

Banner Text

Banner Slogan

Member Login
User Name:
Password:
Register
47 Elizabeth St
Devonport 7310
TAS AU
Tel 03 6423 4840
Fax 03 6424 8260

projects

MMG Rosebery Mine (Flotation Upgrade)

Powertek designed, manufactured, installed and commissioned the new replacement Flotation LV and MV switchboards for MMG Rosebery. Using the latest technology Schneider product for the LV switchboard.We have created an intelligent MSB that is capable of delivering up to date power information to the central control room at any given time.

IMAG2874.jpgIMAG2882.jpg

IMAG2883.jpg

IMAG2970.jpgIMAG2971.jpgIMAG2895.jpgIMAG2906 - Copy.jpg


Fosterville Gold Mine (Elsmere Fan Project)

PowerTek Aus were instrumental in the construction of the Elsmere project. Working closely with the FGM personnel designing manufacturing and suppling the Motor Control Centre and HV equipment. Also PLC installation, programming and onsite commissioning.

Vatukoula Gold Mine (Fiji) HV Switchroom

Powertek Australia designed and manufactured the 11kv High Voltage generator switchroom for the overseas market.

IMG_2915.JPG

IMG_2900.JPG

Fosterville Gold Mine (Inpit Tails Project)

Powertek designed manufactured and supplied the HV, transformer and MCC for this project.

Fosterville Gold Mine (Pole 9 project)

Powertek designed and manufactured the switch room also supplied installed Schneider switchgear for the Pole 9 project

MMG Rosebery Mine (Pieman Pump roject)

Powertek designed , manufactured, installed and commissioned the MCC for this project as a total turn-key service.

Federal Group ($40m Saffire Resort Project)

Saffire Resort Main Switchboard

Underground 6600/1000V substation installation

Powertek designed and manufactured the New Style 1500kVA 1000V Form 4 compact design substation for MMG Rosebery Mine.

IMG_2685.JPG

PA190120.JPG

PA190113.JPG